云南某铜钼矿选厂流程考查与分析

    Process Investigation and Analysis of a Copper Molybdenum Ore Beneficiation Plant in Yunnan

    • 摘要: 【目的】针对云南某选矿厂在生产的过程中矿石含泥量高、铜钼回收率低等问题,【方法】开展了详细的流程考查和工艺矿物学研究。【结果】研究发现,贫连生体和单体流失是铜矿物流失的主要途径,应增加贫连生体再磨的机会和强化单体黄铜矿的捕收。磨矿产品分析得出,应增加磨矿产品中-0.074 + 0.018 mm粒级的含量,减少-0.010 mm粒级的含量。【结论】针对存在的泥化现象,考虑添加调整剂以降低矿泥影响。流程优化方面考虑增加扫选作业,延长浮选时间;操作参数方面考虑提高粗精矿产率,粗选作业回收率预期可达81.02%。

       

      Abstract: Objective A detailed process inspection was conducted to address the issues of high slime and low recovery rate of copper and molybdenum in the production process of a flotation plant in Yunnan. Method Research on process mineralogy has found that the loss of poor coenobium and monomers is the main way for copper mineral loss. Result It is necessary to increase the opportunity for poor coenobium re-grinding and strengthen the flotation of monomeric chalcopyrite. According to the analysis of the grinding products, the particle size distribution of -0.074 mm+0.018 mm should be increased in the grinding products, and the content of -0.010 mm size should be reduced. Conclusion In response to the phenomenon of sliming, it is considered to add adjusting agents to reduce the impact of slime. In terms of process optimization, it is considered to increase the scavenger operation and prolong the flotation time. In terms of operating parameters, by increasing the rougher yield, the recovery rate of rougher is expected to reach 81.02%.

       

    /

    返回文章
    返回